Case Studies


Askern Saw Mill Demolition

Project Overview

IHE Demolition successfully completed the demolition and clearance of the former Askern Saw Mill, a large-scale industrial site comprising multiple buildings and extensive areas of hardstanding.

The project involved the controlled demolition of the site’s buildings, together with the removal and disposal of significant quantities of asbestos. In addition to asbestos identified within several of the existing structures, a substantial quantity of asbestos-containing material had been stockpiled on site. This was carefully managed, removed and disposed of in accordance with all relevant regulations and environmental requirements.

A key element of the project was the removal of a large reinforced concrete pad spanning much of the site. The concrete was demolished, processed and crushed on site, with suitable recycled material being reused within the project to reduce the requirement for imported aggregate. Remaining materials were processed and sent for appropriate recycling and disposal.

The project was delivered with a strong focus on safety, environmental responsibility and efficient material management, ensuring the site was cleared effectively while maximising opportunities for recycling and reuse.

Key Project Elements

  • Demolition of multiple large industrial buildings

  • Removal and compliant disposal of significant quantities of asbestos

  • Removal of stockpiled asbestos-containing materials

  • Demolition and processing of extensive concrete hardstanding

  • On-site crushing and processing of demolition materials

  • Reuse of suitable crushed material on site

  • Recycling and responsible disposal of remaining waste materials

  • Full site clearance and preparation for its next phase of use

Project Outcome

The successful completion of the Askern Saw Mill project demonstrates IHE Demolition’s ability to manage complex industrial demolition projects involving hazardous materials, substantial concrete structures and large volumes of demolition waste, while maintaining high standards of safety, efficiency and environmental compliance.


York Hospital - Secure Care Baby Unit Refurbishment

Project Overview

IHE Demolition was appointed to undertake the internal strip-out works as part of the refurbishment of the Secure Care Baby Unit (SCBU) at York Hospital.

The works involved the careful removal of a range of internal elements, including ceilings, floor finishes, internal walls and other associated fixtures and fittings, preparing the areas for the next stage of the refurbishment.

While the individual strip-out activities were relatively straightforward, the project presented a significant challenge due to the extremely sensitive hospital environment in which the works were being undertaken. Maintaining a safe, clean and controlled working environment was of paramount importance, with strict precautions implemented to minimise the potential impact on patients, staff and hospital operations.

Careful Coordination & Phased Working

Close and continuous communication with both the principal contractor and hospital client was essential throughout the project. All works were carefully coordinated around the hospital's ongoing operations, with activities planned and carried out in controlled phases to minimise disruption.

Certain works were scheduled outside of normal operating hours where required, allowing more intrusive activities to be completed with minimal impact on the hospital environment. Access, working areas, noise, dust and waste movements were all carefully managed to ensure the surrounding areas remained safe and operational.

Key Project Elements

  • Internal strip-out of the Secure Care Baby Unit

  • Removal of ceilings and floor finishes

  • Removal of internal walls and associated elements

  • Strict dust, noise and contamination control measures

  • Phased working to accommodate ongoing hospital operations

  • Out-of-hours working where required

  • Close coordination with the principal contractor and hospital client

  • Controlled removal and disposal of demolition waste

  • Safe working within an extremely sensitive healthcare environment

Project Outcome

The project was successfully completed with minimal disruption to the hospital's operations. Through careful planning, effective communication and a highly controlled approach to the works, IHE Demolition was able to deliver the required strip-out safely and efficiently within one of the most sensitive working environments.

The project highlights IHE Demolition's ability to adapt its working methods to suit challenging environments and demonstrates the importance we place on safety, communication, coordination and minimising disruption to our clients and the wider public.


Leeds Trinity Shopping Centre - Screed Removal

Project Overview

IHE Demolition carried out refurbishment and strip-out works across a number of retail units within Leeds Trinity Shopping Centre, working simultaneously for two separate principal contractors.

The majority of the works involved the removal of existing floor screed to prepare the units for their subsequent refurbishment. This was supplemented by a range of smaller internal demolition and refurbishment activities as required across the individual stores.

Out-of-Hours Working & Site Management

Due to the busy retail environment, all works were undertaken out of hours during the night, allowing the refurbishment programme to progress without disrupting the shopping centre's normal operations.

A key requirement of the project was ensuring that each work area was left in a safe, clean and secure condition at the end of every shift. This was particularly important where areas being worked on during the night were required to be occupied or accessed by other contractors, staff or members of the public the following day.

Working across multiple stores for two principal contractors simultaneously also required effective planning, communication and coordination to ensure each programme was delivered efficiently and to the required timescales.

Key Project Elements

  • Refurbishment and strip-out of multiple retail units

  • Removal of large quantities of existing floor screed

  • Additional minor internal demolition and refurbishment works

  • Night-time and out-of-hours working

  • Simultaneous delivery for two principal contractors

  • Daily preparation and handover of work areas

  • Safe and secure working areas maintained throughout the project

  • Minimising disruption to the shopping centre and its tenants

Project Outcome

IHE Demolition successfully delivered the works across multiple retail units while maintaining the demanding requirements of a live shopping centre environment. The combination of night-time working, effective coordination between two principal contractors and rigorous end-of-shift safety procedures ensured the refurbishment programme could progress efficiently without impacting normal daytime operations.

The project demonstrates IHE Demolition's ability to deliver fast, flexible and well-coordinated refurbishment works within busy live environments, while maintaining high standards of safety and professionalism.